This free curriculum covers every domain assessed in the Oxford Certified Strategic Operations Leader examination: operations strategy, process design, capacity and constraints, lean, Six Sigma, quality, performance measurement, planning and inventory, service and digital operations, and leading an improvement culture. Read each chapter, note the key points, and then sit the 80-question examination.

Ready? Take the free exam 100 min · 80 questions
Chapter 1

Operations strategy

Operations strategy aligns how work is done with how the business competes. Five performance objectives guide decisions: quality (doing things right), speed (doing things fast), dependability (doing things on time), flexibility (changing what is done) and cost. Organisations prioritise objectives according to their market position, accepting trade-offs.

Order qualifiers are the minimum performance needed for customers to consider you; order winners are the factors that make customers choose you. Operational excellence is a culture and management system in which everyone continuously improves value delivery, not a one-off target.

  • Quality, speed, dependability, flexibility, cost
  • Derive operations priorities from competitive strategy
  • Qualifiers get you considered; winners get you chosen
  • Excellence is a continuous management system
Key takeaway: Operations strategy turns competitive intent into daily capability.
Chapter 2

Process design

Process types range from projects (low volume, high variety — building a bridge) through jobbing and batch processes to mass and continuous processes (high volume, standardised — soft drinks). Service processes range from professional services to mass services. The right design matches volume and variety.

Batch size strongly affects flow: smaller batches reduce work in progress and lead time and expose problems sooner. Business process re-engineering seeks radical redesign, while kaizen seeks incremental improvement; both have their place. RACI matrices clarify who is responsible, accountable, consulted and informed.

  • Match process type to volume and variety
  • Smaller batches improve flow
  • BPR for radical change, kaizen for continuous change
  • Clarify roles with RACI
Key takeaway: Good process design makes good performance the natural outcome.
Chapter 3

Capacity, bottlenecks and the Theory of Constraints

Capacity utilisation is actual output divided by available capacity. The bottleneck — the step with the lowest capacity — limits the whole system: a clinic with steps of 30, 12 and 25 patients per hour can serve only 12. Improving non-bottlenecks does not raise system throughput. As utilisation approaches 100%, waiting times rise sharply.

The Theory of Constraints uses five focusing steps: identify the constraint, exploit it (maximise its output with existing resources), subordinate everything else to it, elevate it (add capacity) and repeat. Drum-Buffer-Rope schedules the system to the pace of the constraint. Capacity strategies include chase demand (flex capacity to demand) and level capacity (constant output with inventory buffers). Little's Law links WIP, throughput and flow time.

  • The bottleneck sets system output
  • Identify, exploit, subordinate, elevate, repeat
  • Drum-Buffer-Rope
  • High utilisation creates long queues
  • Chase vs level capacity strategies
Key takeaway: Improve the constraint first — everything else is secondary.
Chapter 4

Lean thinking

Lean maximises customer value while eliminating waste. The seven wastes (TIMWOOD) are transport, inventory, motion, waiting, overproduction, over-processing and defects; overproduction is the worst because it hides problems and creates other wastes. Value stream maps show material and information flow and waiting times.

Key tools include takt time (available time ÷ demand — 450 minutes ÷ 90 units = 5 minutes per unit), pull systems triggered by real demand, 5S (sort, set in order, shine, standardise, sustain), poka-yoke mistake-proofing, SMED to shorten changeovers, kaizen continuous improvement and going to gemba to see work where it happens.

  • Value is defined by the customer
  • TIMWOOD wastes; overproduction is the worst
  • Map the value stream first
  • Takt time sets the rhythm of demand
  • Pull, 5S, poka-yoke, SMED, kaizen, gemba
Key takeaway: Lean is a way of seeing — learn to see waste and remove it.
Chapter 5

Six Sigma and problem solving

Six Sigma reduces variation and defects, targeting about 3.4 defects per million opportunities. Projects follow DMAIC: define, measure, analyse, improve and control. Many gains fail because the control phase is weak — standard work, monitoring and ownership are needed to sustain improvements.

Statistical process control distinguishes common cause variation (natural to a stable process) from special cause variation (unusual events), signalled by points outside control limits. Control limits come from process data and differ from customer specification limits. Pareto charts focus on the vital few causes; fishbone diagrams organise possible causes; the 5 Whys explores cause and effect.

  • DMAIC with a strong control phase
  • Common vs special cause variation
  • Control limits ≠ specification limits
  • Pareto, fishbone and 5 Whys
Key takeaway: Understand variation before you react to it.
Chapter 6

Quality management

Total Quality Management involves everyone in customer focus and continuous improvement. ISO 9001 specifies requirements for a quality management system. The cost of quality includes prevention, appraisal, internal failure and external failure costs; external failures — warranty claims, lost customers — are the most damaging. Investing in prevention usually lowers total quality costs.

Quality management relies on facts: measure defects and customer complaints, analyse root causes and verify that corrective actions work. Suppliers are part of the quality system, so agree clear specifications and monitor supplier quality as carefully as internal processes.

  • Quality is everyone's responsibility
  • ISO 9001 for quality management systems
  • Prevention, appraisal, internal and external failure costs
  • Prevention is the best investment
Key takeaway: It is always cheaper to prevent a defect than to fix it in the customer's hands.
Chapter 7

Measuring operational performance

Overall Equipment Effectiveness equals availability × performance × quality (90% × 80% × 95% ≈ 68%). The balanced scorecard combines financial, customer, internal process and learning-and-growth perspectives. Leading indicators — such as preventive maintenance completed on schedule — predict future results; lagging indicators report past outcomes.

Local efficiency metrics can harm the whole system by encouraging excess inventory or delays elsewhere, and dashboards with too many KPIs obscure what matters. When a KPI deteriorates, investigate root causes with data and observation before acting.

  • OEE = availability × performance × quality
  • Balanced scorecard perspectives
  • Lead and lag indicators
  • Optimise the system, not local metrics
  • Few, meaningful KPIs
Key takeaway: Measure what drives customer value and act on what the data shows.
Chapter 8

Planning: S&OP, forecasting and inventory

Sales and Operations Planning is a monthly cross-functional process that balances demand and supply and aligns them with the financial plan, producing one agreed plan. Forecasts are less accurate over long horizons, for volatile or new products and at very detailed levels; aggregation improves accuracy.

Safety stock protects against demand and lead-time variability. ABC analysis focuses control on high-value items. The Economic Order Quantity balances ordering and holding costs. Rising inventory without better service usually signals forecast, lead-time or safety-stock problems that need analysis before any arbitrary cuts.

  • S&OP creates one integrated plan
  • Aggregate forecasts are more accurate
  • Safety stock for variability
  • ABC analysis and EOQ
  • Diagnose inventory growth with data
Key takeaway: Integrated planning prevents departments from optimising against each other.
Chapter 9

Service operations

Service blueprints map customer actions, front-stage and back-stage activities and support processes, separated by the line of visibility. Queue management combines capacity decisions with psychology: informed, occupied customers perceive waits as shorter.

In services, production and consumption often happen at the same time and customers participate in the process, so variability is higher than in manufacturing. Standardise the back stage, empower front-line staff to handle variation, and design service recovery so that problems are fixed quickly when they occur.

  • Blueprint services end to end
  • Manage what customers see and what they do not
  • Design queues and waiting experiences deliberately
  • Service quality depends on back-stage processes too
Key takeaway: In services, the customer experiences the process directly.
Chapter 10

Digital operations and automation

Robotic process automation suits high-volume, rule-based tasks with structured data. Before automating, simplify and standardise processes so waste is not automated; handle exceptions and input formats first. Digital twins simulate production changes before physical implementation. Outsourcing can add capability or reduce cost but transfers control, so core capabilities need careful evaluation.

Digital operations depend on reliable data. Sensors, workflow systems and analytics give real-time visibility of performance, but only when data definitions are clear and the data is trusted. Change management matters as much as technology: involve the people who do the work in designing and testing automation.

  • Simplify, standardise, then automate
  • RPA for repetitive rule-based work
  • Digital twins for simulation
  • Evaluate outsourcing strategically
Key takeaway: Automation multiplies whatever process it runs — make the process good first.
Chapter 11

Strategy deployment and improvement culture

Hoshin Kanri aligns breakthrough objectives with improvement priorities at every level using catchball — two-way dialogue to refine goals. Standard work documents the current best method and is the baseline for improvement. Tiered daily huddles escalate problems quickly to people who can remove obstacles.

Leaders build improvement cultures by coaching teams to solve problems, making problems visible without blame, recognising small improvements and building frontline problem-solving capability. Prioritise improvements that lift system throughput and customer value. Sustainability and efficiency often reinforce each other — reducing scrap and energy cuts both cost and environmental impact.

  • Hoshin Kanri and catchball
  • Standard work as the improvement baseline
  • Tiered huddles for fast escalation
  • Coach, make problems visible, recognise progress
  • Prioritise by system impact
Key takeaway: Leaders create the habits that make improvement everyone's daily work.

Ready? Take the free exam

Take the exam and earn your digital badge free of charge. After passing, you may order the official certificate.